Allerton Steel fabricated and installed Battenhall Bridleway Bridge - Worcester.
Posted on 19 April 2024

Allerton Steel fabricated and installed Battenhall Bridleway Bridge - Worcester.
This 'Through Arch' structure over a dual carriageway in Worcester was fabricated from 660mm diameter tubes for the main arch chords and 508mm diameter tubes with 20mm thick plate for the deck structure. The deck structure was suspended from the arch using 42mm diameter Macalloy hangers.
This bridge project involved a large site assembly and installation package using temporary 'MAT 75' trestles to support the structure during site welding and painting.
The finished bridge, 63m long x 5.0m wide and a total weight of 170 tonnes was installed in a single lift using a 1250te crane. Installation took place during a single 48 hours weekend road closure.
Steel grades: S355J2H and S355J2+N.
Paint system: Highways Type II, with Equestrian mastic asphalt deck surfacing.
Allerton scope of work was for all material supply, fabrication, delivery, site assembly, site welding, paint remedials, installation and deck surfacing.
Operating from modern workshops with over 4500sq/m (50,000sq/ft) capacity. The workshops offer a lift capacity up to 60 tonnes and are equipped with modern plant and machinery including semi-automatic welding, CNC operated profile, saw, drilling and milling machines. Additionally, we have a 3D modelling and surveying system to assist with complex fabrications and inspection.
- Welding - MMA; MIG; MAG, Sub-arc, - High tensile and weathering steels.
- Complex fabrications up to 40m long and 5.5m wide.
- In-house machining, 3 no. High Accuracy milling machines. 11m bed, 11m travel 2.5 face up size
- Profiling - 27m x 3m deck. 300mm thickness, bevel and straight cutting. Automatic drilling head
- 60 Tonne overhead crane capacity
- CNC drill and saw line up to 914UB size
- Site welding services
- Proof loading
- Weld test; MPI or Radiography
- Trial assembly
- 3D modelling system
- Mechanical & hydraulic assembly
UKCA Marked to Execution Class 4 BS EN 1090 with ISO 3834-2 Welding Quality Management certification.
For Military we are JOSCAR approved, for highways bridges we are NHSS Sector 20 and RQSC qualified, for Network Rail-bridges we are RISQS qualified. We hold ISO 9001:2015, ISO 45001:2018 and hold the BCSA Sustainability Award - Silver Standard and Construction Line - Gold Standard.