Let's talk

Footbridge to span Dual carriageway in West Midlands

Posted on 28 June 2019

Footbridge to span Dual carriageway in West Midlands

Allerton Steel is currently fabricating a footbridge for installation in the West Midlands. Bridge span is 62m and weight 170t.

The picture shows the central arch section which weighs 25t and is 26m long x 4m wide x 3.4m high. It is fabricated from dia 660 x 25mm wall tube from S355J2H steel.

The largest deck section was 31t and is 25.3m long x 5.7m wide, with two further deck sections completing the bridge deck.

Once on site in the West Midlands, the three deck sections, central arch and four lower arch sections, will be welded together ready for installation by a 1250t crane lifting 170t structure, with super lift, at a 35m radius during a 24hr road closure.

 In line with current bridge standards this project is manufactured and tested to BS EN 1090-2 Exc 3. The whole structure is protected with Highways paint system Type II.

Operating from modern workshops and office facilities on two sites, with over 6,950 sq m (75,000 sq ft) capacity. The workshops offer a lift capacity up to 60 tonnes and are equipped with modern plant and machinery including semi-automatic welding, CNC operated profile, saw, drilling and milling machines. Additionally, we have a 3D modelling and surveying system to assist with complex fabrications and inspection.

CE Marked to Class 4 BS EN 1090, for highways bridges we are NHSS Sector 20 and RQSC qualified, for Network Rail-bridges we are RISQS qualified. We hold BS EN 9001:2015 and BS EN 18001:2007 and hold the BCSA Sustainability Award - Silver Standard and Construction Line - Gold Standard.

Allerton Steel is experienced in fabricating a wide range of road, rail, foot and bridleway bridges. In addition, we can offer installation services if required across the UK.

For information please call 01609 774471/ 07966 223416

email allan.waller@allertonsteel.co.uk   

view our website

Loading...