Feedwater pumps are the heart of any steam generation process and as such, they are considered critical assets. When viewed from the cardiologic perspective, feedwater pump criticality becomes patently obvious, without a healthy, reliable heart, the process will degrade and eventually cease to function. Just as an electro-cardiogram provides a medical expert with valuable performance data on the human heart during a stress test, field pump performance testing provides the expert with developed head, capacity and efficiency data under normal (or abnormal) operating conditions.
Chris Muscavage, Field Technical Service Engineer, at Sulzer, looks at the importance of pump performance testing and how it can improve plant reliability.
Fossil fuels continue to be the primary source fuel for power generation which, according to the U.S. Energy Information Administration in 2017, accounted for 62.7% of capacity with nuclear capacity accounting for an additional 20%. This equates to nearly 83% of U.S. power being wholly or partially reliant upon steam generation utilizing feedwater pumps.
Deregulation has given rise to an open market where pump “design point” and actual “operating point” may no longer be equivalent and may vary significantly. Such market-driven conditions primarily affect combined-cycle, coal, and biomass-fueled generators during Independent System Operator (ISO) dispatch control. Where is my pump operating? Which pump should take overhaul priority? These are certainly valid questions regarding asset availability, reliability and the associated financial consequences of “abnormal operation”.
In the following example, one boiler feedwater pump (BFP) was selected from a group of eight where proactive field performance testing was accomplished. Performance testing was employed to provide the owner/operator with quantifiable pump condition data to aid in prioritizing unit overhaul schedules. This particular generation facility is configured with six separate combined-cycle units employing 12 feed water pumps. The example pump is one of eight axial-split, multi-stage, ring-section pumps. At the time of field performance testing, gross facility generation was limited by ISO dispatch to 60 percent of full generator / heat recovery steam generator (HRSG) load.
Figure 1 shows pump hydraulic performance “as found”. Note how far to the left of best efficiency point (BEP), shown in blue, test results, shown in red, fall on the original equipment manufacturer (OEM) test curve. Critical pump operation is expected to fall within 70-120% of BEP. In this case, although test results fall directly on the test curve indicating satisfactory performance, subject pump hydraulic results show operation at 58% of BEP. This is a surprisingly common situation in the current generation market.
In addition, in cases where the pump’s NPSHr curve rises with a reduction in capacity, the NPSHa may be insufficient to overcome the on-set of cavitation. Operation at lower than recommended BEP flows can result in pump inlet flow recirculation leading to increased vibration, wear and reduction in mean-time-between-repairs (MTBR).